PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at Bathrooms 133-136 Facing North.jpg Installing split wire aboce the ceiling for the Emergency night lighting Facing East.jpg Laying out block at the Attorneys Room Facing East.jpg Connecting copper piping to the 2nd floor VAV boxes Facing West.jpg Installed conduit inside the door frames Facing South.jpg Installed copper piping at the 4th floor Bathrooms Facing West.jpg Installing duct work raiser at the 4th floor Facing North-West.jpg Installing sprinkler branches and heads at the 4th floor Facinf East.jpg Installing sprinkler branches at the 4th floor Facing North.jpg
Previous pageNext page Installed conduit inside the door frames Facing South
Installed conduit inside the door frames Facing South